色六月 丁香 婷婷-91农村精品一区二区在线-韩国黄视频在线观看-日韩女同性恋在线播放-99精品视频在线观看播放免费-av蜜桃成人免费在线观看-91嫩草国产线观看亚洲一区二区-久久久久久aaaa-日韩美女淫语av在线,天天日天天射天天爱天天做天天插,999精品色在线观看,国产精品久久久久久久久大全

Welcome to Tianjin Weisi Experimental Instrument Technology Co., Ltd!
18702252422
Environmental Testing chamber

Space Environment Test Module

Another name:

Describe:Used for conducting thermal balance tests and thermal vacuum tests on various space equipment.2. Basic requirements

Consultation

Details

1、 The purpose and characteristics of the equipment:

1. Used for conducting thermal balance tests and thermal vacuum tests on various space equipment.

2. Basic requirements

3. Manufacturers of space environment testing equipment have High design and manufacturing capabilities and are well-known domestic brands;

4. Meet the standards:

QJ 20127 Technical Requirements for Spacecraft Space Thermal Environment Test Equipment;

GJB 1033 Spacecraft Thermal Balance Test Method;

Test requirements for GJB 1027 carrier, upper stage, and spacecraft;

GJB 2209 Specification for Geosynchronous Orbit Satellite Transponder;

GJB 2042 Satellite Power System Specification;

QJ 1446 Satellite Thermal Vacuum Test Method.

5. Excellent after-sales service and quality assurance should be provided, and the entire machine is guaranteed for 3 years from the date of acceptance.

This equipment is mainly used for high and low temperature tests and low-pressure discharge tests under high vacuum conditions, and can also be used as a simulation test equipment for other small components in orbit.

6. This technical solution is developed based on the technical requirements of the central thermal vacuum testing equipment (mechanical refrigeration). This technical solution is one of the basis for designing and manufacturing the equipment. This equipment includes five aspects: thermal vacuum simulation container, vacuum protection system, high and low temperature protection system, thermal vacuum state control and display system, and auxiliary supporting system. The equipment developed based on this technical solution can truly simulate the cold and hot environment of a vacuum space, and can effectively control, monitor, and record the vacuum degree and temperature of the space. The device has the following characteristics.

7. The entire equipment vacuum system adopts a low-temperature pump as the main pump, with a screw dry pump as the front stage and pre pumping pump, which can achieve the required working vacuum degree for oil-free testing; In terms of temperature control, mechanical refrigeration is used to obtain a low-temperature background, and advanced intelligent PID temperature controllers are used to control the heating current of the heating cage, thereby accurately controlling the temperature; The acquisition of low temperature adopts a unique mechanical refrigeration technology, which eliminates the cost of using liquid nitrogen refrigeration. The control system adopts a combination of industrial computer and PLC for joint control. The display interface of the industrial computer is clear and easy to understand, the PLC control is accurate and reliable, and the fault diagnosis is simple. In addition, different temperature curve formulas can be made according to the user's process requirements, stored in the industrial computer, and available for users to choose and call during the experiment, making it easy for users to master when conducting experimental operations. In summary, this equipment has high vacuum degree, easy temperature control and good uniformity, stable and reliable long-term operation, and can work continuously for more than 30 days. It is easy and convenient to operate and use. This device has certain specificity and universality, and is an essential equipment for space environment simulation experiments.

2、 Components of Equipment Design

1. Vacuum simulation container (vacuum chamber and internal support)

2. Vacuum protection system (vacuum pump, valve, pipeline, and vacuum measurement)

3. Temperature guarantee system:

Low temperature refrigeration system: (regional temperature control refrigeration unit+liquid nitrogen refrigeration, heat sink, low-temperature valve and connecting pipe)

Heating and temperature control system: (heating cage, heating power supply), heating cage, vacuum sealed heating electrode, transformer, voltage regulating module, temperature control box

4. Control and monitoring system (cabinet, industrial computer, PLC).

5. Auxiliary supporting systems (air pump, cooling circulating water machine, pollution monitoring)

3、 Main technical indicators of equipment system (excerpt)

Vacuum degree parameter

1. Internal dimensions of the main heat sink: φ 2m * 4m (length)

2. Equipment usage environment: temperature 0 ℃~40 ℃, humidity ≤ 60%;

3. The total power consumption of the equipment is expected to be 120kw/380V

Equipment lighting system; The lighting intensity shall not be less than 200LX, and the protection level shall be IP67

4. Temperature control platform: Thermal oil process;

5. Temperature range of the inner surface of the heat sink: ≥- 150~+160℃

6. Working vacuum degree: ≤ 1.3X10-3 Pa; (at room temperature, with load);

7. No load limit vacuum degree: ≤ 2X10-5 Pa; (Low temperature, no load);

8. High temperature no-load vacuum degree: ≤ 5X10-4Pa(100℃,3~4h)

9. Vacuum degree time< 4h

10. The total leakage rate of helium mass spectrometry leak detection for hot vacuum tank body is ≤ 1e-9Pa * m& sup3;/ s;

When the heat sink is at room temperature, the pressure inside the vacuum tank can reach 1.33X10-4Pa within 4 hours after the high vacuum pump starts pumping

The pressure can be maintained at a constant value within the range of 12.1000Pa~1.0Pa, and it should be pumped from atmospheric pressure to 1Pa for no more than 20 minutes

Test piece temperature

13. Controllable temperature range for heat sink: -150 ℃~160 ℃; Liquid nitrogen refrigeration+infrared heating cage, or mechanical refrigeration can also be used

It is recommended to use mechanical refrigeration, which can save a lot of operating costs.

14. Temperature display accuracy: 0.1 ℃;

15. Temperature fluctuation: ≤ ±1℃;

16. Temperature uniformity: High temperature constant temperature for 2 hours, temperature uniformity ± 3 ℃

Low temperature constant temperature for 2 hours, temperature uniformity ± 5 ℃;

Heat sink index (bottom plate index)

1. Gas nitrogen process (external heat flow):

Heat sink heating and cooling rate ≥ 1 ℃/min

Temperature range of the inner surface of the heat sink:- 150~+160℃

Uniformity of heat sink temperature: ± 2 ℃

Temperature control precision of temperature control base plate: ± 0.5 ℃

2. Liquid nitrogen process:

Heat sink temperature rate: ≥ 1 ℃/min (-150 ℃~+160 ℃).

Temperature controlled base plate

1. Temperature control process of thermal oil:

Effective temperature control zone: 1.0X1.2m2 x 2

Temperature range of temperature control base plate:- 75℃~+130℃;

Temperature uniformity of temperature control base plate: ± 2 ℃;

Temperature control precision of temperature control base plate: ± 0.5 ℃

Heating and cooling rate: The average temperature change rate of the heat sink and bottom plate (within the range of -45 ℃ to+85 ℃) is ≥ 3 ℃/min;

After the equipment reaches the end temperature during temperature rise and fall operation, the temperature overshoot is less than 2 ℃, and the temperature stabilization time is less than or equal to; 30min;

The bottom plate is easy to disassemble and has a load-bearing capacity of not less than 200kg.

2. Liquid nitrogen process:

Heat sink temperature rate: ≥ 3 ℃/min (-75 ℃~+130 ℃).

Configure the track inside the tank, with a load capacity of ≥ 1000kg (calculated based on a net weight of 500kg for the satellite), and hang a set of tracks inside the tank with a load capacity of ≥ 700kg;

3、 Main technical indicators of equipment system (excerpt)

Vacuum degree parameter

1. Internal dimensions of the main heat sink: φ 2m * 4m (length)

2. Equipment usage environment: temperature 0 ℃~40 ℃, humidity ≤ 60%;

3. The total power consumption of the equipment is expected to be 120kw/380V

Equipment lighting system; The lighting intensity shall not be less than 200LX, and the protection level shall be IP67

4. Temperature control platform: Thermal oil process;

5. Temperature range of the inner surface of the heat sink: ≥- 150~+160℃

6. Working vacuum degree: ≤ 1.3X10-3 Pa; (at room temperature, with load);

7. No load limit vacuum degree: ≤ 2X10-5 Pa; (Low temperature, no load);

8. High temperature no-load vacuum degree: ≤ 5X10-4Pa(100℃,3~4h)

9. Vacuum degree time< 4h

10. The total leakage rate of helium mass spectrometry leak detection for hot vacuum tank body is ≤ 1e-9Pa * m& sup3;/ s;

When the heat sink is at room temperature, the pressure inside the vacuum tank can reach 1.33X10-4Pa within 4 hours after the high vacuum pump starts pumping

The pressure can be maintained at a constant value within the range of 12.1000Pa~1.0Pa, and it should be pumped from atmospheric pressure to 1Pa for no more than 20 minutes

Test piece temperature

13. Controllable temperature range for heat sink: -150 ℃~160 ℃; Liquid nitrogen refrigeration+infrared heating cage, or mechanical refrigeration can also be used

It is recommended to use mechanical refrigeration, which can save a lot of operating costs.

14. Temperature display accuracy: 0.1 ℃;

15. Temperature fluctuation: ≤ ±1℃;

16. Temperature uniformity: High temperature constant temperature for 2 hours, temperature uniformity ± 3 ℃

Low temperature constant temperature for 2 hours, temperature uniformity ± 5 ℃;

Heat sink index (bottom plate index)

1. Gas nitrogen process (external heat flow):

Heat sink heating and cooling rate ≥ 1 ℃/min

Temperature range of the inner surface of the heat sink:- 150~+160℃

Uniformity of heat sink temperature: ± 2 ℃

Temperature control precision of temperature control base plate: ± 0.5 ℃

2. Liquid nitrogen process:

Heat sink temperature rate: ≥ 1 ℃/min (-150 ℃~+160 ℃).

Temperature controlled base plate

1. Temperature control process of thermal oil:

Effective temperature control zone: 1.0X1.2m2 x 2

Temperature range of temperature control base plate:- 75℃~+130℃;

Temperature uniformity of temperature control base plate: ± 2 ℃;

Temperature control precision of temperature control base plate: ± 0.5 ℃

Heating and cooling rate: The average temperature change rate of the heat sink and bottom plate (within the range of -45 ℃ to+85 ℃) is ≥ 3 ℃/min;

After the equipment reaches the end temperature during temperature rise and fall operation, the temperature overshoot is less than 2 ℃, and the temperature stabilization time is less than or equal to; 30min;

The bottom plate is easy to disassemble and has a load-bearing capacity of not less than 200kg.

2. Liquid nitrogen process:

Heat sink temperature rate: ≥ 3 ℃/min (-75 ℃~+130 ℃).

Configure the track inside the tank, with a load capacity of ≥ 1000kg (calculated based on a net weight of 500kg for the satellite), and hang a set of tracks inside the tank with a load capacity of ≥ 700kg;

 4、 Structure section

1. The test chamber container is designed as a vacuum container and has a horizontal circular cylindrical structure. It is supported by a support frame at the bottom, which directly lands on the ground

2. The vacuum chamber adopts a horizontal stainless steel vacuum container (made of SUS304 stainless steel, with a thickness of 16mm), and the inner side is

Mirror polishing, white spray coating on the outside; The vacuum chamber is equipped with low-pressure lighting, with a brightness of not less than 200 lumens. Vacuum chamber with built-in cargo platform

The platform.

Configure the track inside the tank, and set two parallel guide rails inside the heat sink. The top height of the guide rails is about 60cm below the centerline of the heat sink (safe installation will be carried out in the later stage of development, and the guide rail design will be confirmed by the demand side). The guide rail can bear a load of ≥ 3 tons.

Configure the lifting and unloading vehicle to complete the installation and docking between the test piece (about 3 tons) and the guide rail,

Install separate guide rails and a temperature control platform for each zone. The temperature control platform can be removed or does not affect the entry and exit of the 3-ton test piece.

Reserve at least 100 temperature measurement terminals for backup by the purchaser, and the selection and length of the temperature measurement terminals shall be confirmed by the purchaser

Reserve at least 100 temperature measurement terminals for backup by the purchaser, and the selection and length of the temperature measurement terminals shall be confirmed by the purchaser

Observation window size: φ300mm, Install one at the center position of the front head of the vacuum container (or according to customer requirements), and install one on one side of the tank perpendicular to the axis direction of the tank to facilitate observation of the situation inside the container during the test

Special aerospace black paint is sprayed on the surface, with a solar absorption coefficient of ≥ 0.90 and a hemispherical emissivity of ≥ 0.90, and it does not peel off within the temperature range of 100K to 150 ℃.

Through holes should be reserved on the cold plate; The loading platform has a pull-out function and can be used for assembling test pieces outside of cabin 54. The vacuum container is a horizontal cylindrical shape;

The vacuum container and internal structural materials are made of 0Gr18Ni9 stainless steel, the external structural components are made of carbon steel, and the outside of the container is treated with spray paint;

The inner wall of the vacuum container is polished (0.8um), and 8 necessary flange holes are opened on the wall (4 on each side), including the inlet and outlet interfaces of the nitrogen packaging system, vacuum pumping interface, vacuum gauge interface, temperature measurement and control interface, inflation interface, and other flanges.

1、 The purpose and characteristics of the equipment:

1. Used for conducting thermal balance tests and thermal vacuum tests on various space equipment.

2. Basic requirements

3. Manufacturers of space environment testing equipment have high design and manufacturing capabilities and are well-known domestic brands;

4. Meet the standards:

QJ 20127 Technical Requirements for Spacecraft Space Thermal Environment Test Equipment;

GJB 1033 Spacecraft Thermal Balance Test Method;

Test requirements for GJB 1027 carrier, upper stage, and spacecraft;

GJB 2209 Specification for Geosynchronous Orbit Satellite Transponder;

GJB 2042 Satellite Power System Specification;

QJ 1446 Satellite Thermal Vacuum Test Method.

5. Excellent after-sales service and quality assurance should be provided, and the entire machine is guaranteed for 3 years from the date of acceptance.

This equipment is mainly used for high and low temperature tests and low-pressure discharge tests under high vacuum conditions, and can also be used as a simulation test equipment for other small components in orbit.

6. This technical solution is developed based on the technical requirements of the central thermal vacuum testing equipment (mechanical refrigeration). This technical solution is one of the basis for designing and manufacturing the equipment. This equipment includes five aspects: thermal vacuum simulation container, vacuum protection system, high and low temperature protection system, thermal vacuum state control and display system, and auxiliary supporting system. The equipment developed based on this technical solution can truly simulate the cold and hot environment of a vacuum space, and can effectively control, monitor, and record the vacuum degree and temperature of the space. The device has the following characteristics.

7. The entire equipment vacuum system adopts a low-temperature pump as the main pump, with a screw dry pump as the front stage and pre pumping pump, which can achieve the required working vacuum degree for oil-free testing; In terms of temperature control, mechanical refrigeration is used to obtain a low-temperature background, and advanced intelligent PID temperature controllers are used to control the heating current of the heating cage, thereby accurately controlling the temperature; The acquisition of low temperature adopts a unique mechanical refrigeration technology, which eliminates the cost of using liquid nitrogen refrigeration. The control system adopts a combination of industrial computer and PLC for joint control. The display interface of the industrial computer is clear and easy to understand, the PLC control is accurate and reliable, and the fault diagnosis is simple. In addition, different temperature curve formulas can be made according to the user's process requirements, stored in the industrial computer, and available for users to choose and call during the experiment, making it easy for users to master when conducting experimental operations. In summary, this equipment has high vacuum degree, easy temperature control and good uniformity, stable and reliable long-term operation, and can work continuously for more than 30 days. It is easy and convenient to operate and use. This device has certain specificity and universality, and is an essential equipment for space environment simulation experiments.

2、 Components of Equipment Design

1. Vacuum simulation container (vacuum chamber and internal support)

2. Vacuum protection system (vacuum pump, valve, pipeline, and vacuum measurement)

3. Temperature guarantee system:

Low temperature refrigeration system: (regional temperature control refrigeration unit+liquid nitrogen refrigeration, heat sink, low-temperature valve and connecting pipe)

Heating and temperature control system: (heating cage, heating power supply), heating cage, vacuum sealed heating electrode, transformer, voltage regulating module, temperature control box

4. Control and monitoring system (cabinet, industrial computer, PLC).

5. Auxiliary supporting systems (air pump, cooling circulating water machine, pollution monitoring)

3、 Main technical indicators of equipment system (excerpt)

Vacuum degree parameter

1. Internal dimensions of the main heat sink: φ 2m * 4m (length)

2. Equipment usage environment: temperature 0 ℃~40 ℃, humidity ≤ 60%;

3. The total power consumption of the equipment is expected to be 120kw/380V

Equipment lighting system; The lighting intensity shall not be less than 200LX, and the protection level shall be IP67

4. Temperature control platform: Thermal oil process;

5. Temperature range of the inner surface of the heat sink: ≥- 150~+160℃

6. Working vacuum degree: ≤ 1.3X10-3 Pa; (at room temperature, with load);

7. No load limit vacuum degree: ≤ 2X10-5 Pa; (Low temperature, no load);

8. High temperature no-load vacuum degree: ≤ 5X10-4Pa(100℃,3~4h)

9. Vacuum degree time< 4h

10. The total leakage rate of helium mass spectrometry leak detection for hot vacuum tank body is ≤ 1e-9Pa * m& sup3;/ s;

When the heat sink is at room temperature, the pressure inside the vacuum tank can reach 1.33X10-4Pa within 4 hours after the high vacuum pump starts pumping

The pressure can be maintained at a constant value within the range of 12.1000Pa~1.0Pa, and it should be pumped from atmospheric pressure to 1Pa for no more than 20 minutes

Test piece temperature

13. Controllable temperature range for heat sink: -150 ℃~160 ℃; Liquid nitrogen refrigeration+infrared heating cage, or mechanical refrigeration can also be used

It is recommended to use mechanical refrigeration, which can save a lot of operating costs.

14. Temperature display accuracy: 0.1 ℃;

15. Temperature fluctuation: ≤ ±1℃;

16. Temperature uniformity: High temperature constant temperature for 2 hours, temperature uniformity ± 3 ℃

Low temperature constant temperature for 2 hours, temperature uniformity ± 5 ℃;

Heat sink index (bottom plate index)

1. Gas nitrogen process (external heat flow):

Heat sink heating and cooling rate ≥ 1 ℃/min

Temperature range of the inner surface of the heat sink:- 150~+160℃

Uniformity of heat sink temperature: ± 2 ℃

Temperature control precision of temperature control base plate: ± 0.5 ℃

2. Liquid nitrogen process:

Heat sink temperature rate: ≥ 1 ℃/min (-150 ℃~+160 ℃).

Temperature controlled base plate

1. Temperature control process of thermal oil:

Effective temperature control zone: 1.0X1.2m2 x 2

Temperature range of temperature control base plate:- 75℃~+130℃;

Temperature uniformity of temperature control base plate: ± 2 ℃;

Temperature control precision of temperature control base plate: ± 0.5 ℃

Heating and cooling rate: The average temperature change rate of the heat sink and bottom plate (within the range of -45 ℃ to+85 ℃) is ≥ 3 ℃/min;

After the equipment reaches the end temperature during temperature rise and fall operation, the temperature overshoot is less than 2 ℃, and the temperature stabilization time is less than or equal to; 30min;

The bottom plate is easy to disassemble and has a load-bearing capacity of not less than 200kg.

2. Liquid nitrogen process:

Heat sink temperature rate: ≥ 3 ℃/min (-75 ℃~+130 ℃).

Configure the track inside the tank, with a load capacity of ≥ 1000kg (calculated based on a net weight of 500kg for the satellite), and hang a set of tracks inside the tank with a load capacity of ≥ 700kg;

  

Label:Space Environment Test Module

Previous:Multi gas corrosion test chamber

Hotline:18702252422

Copyright ? 2018 Tianjin Weisi Experimental Instrument Technology Co., Ltd.. All rights reserved     

   

Service
Hot Line

Hot Line

18702252422

WeChat
TOP
麻豆免费视频 国产在线观看-乱子伦国产精品视频-女人高潮二区三区四区av-日韩中文字幕一区av | 久久久99精品免费观看不卡-99久久久久久久久久国产免费-开心五月婷婷激情四射网-精品少妇一区二区三区免费视频 | 激情五月天亚洲综合网-五月天久久婷婷丁香-蜜臀av一区二区三区人妻在线-欧美日韩人妻久久精品高清国产 | 韩国日本免费一级片-91成人在线观看入口-中文字幕人妻系列一区-人妻欧美亚洲中文字幕第一 | 天天干天天操天天干天-免费中文字幕av在线观看-久久久久91精品91-国产又黄又粗又硬免费视频 | 国产精品,偷拍自拍-天天操天天干天天爽天天想-麻豆综合88久久人妻熟女-一本久久伊人热热精品中文 | 91亚洲精品久久久久图片蜜桃-久久精品国产亚洲av高清y-成人乱码一区二区三区-av新天堂免费在线 | 日韩欧美国产制服丝袜-18禁国产91精品久久久久久-久久综合色鬼色88-国产'av一区二区三区 | 日本精品无人区1区2区3区-日韩av怡红院-人妻体内精一区二区-777人澡人妻人人做人人爽 | 18久久久久久禁播-日韩成人伦理影视-99精品视频全部免费观看网站-99一区二区在线观看 | 亚洲av网站在线免费观看-日韩精品系列视频在线-久久人妻精品con-av一区二区不大av | 99久久生活综合精品-国产日韩欧美一区二区综合-99久久免费精品国产男女性高-日本少妇人妻一区 | 日本久久高清免费福利-久久精品国产99久久6动漫-精品人妻一区二区专区-都市激情 中文字幕 校园春色 | 中文字幕熟女人妻丝袜在线-午夜精品久久久久久久精品乱码开元-聚伦 人妻 少妇 中文字幕-久久久久人妻一区精品色戒 | 国产精品费久久久久久久久-97日韩美女视频网-国产精品人妻人伦a v久久-国产精品久久久老熟女 | 欧美中文字幕不-2015中文字幕一区二区三区-77久久久久国产精产品-91精品久久久久久久蜜月 | 国产精品91免费在线观看-男人插女人逼逼视频-久久99麻豆精品国产免费-有码中文字幕制服a∨ | 亚洲欧美制服丝袜另类-手机在线免费观看黄色av网站-精品久久久久久中文幕-激情五月五月激情啪啪 国产视频一区二区网站-2020亚洲精品极品色在线-少妇熟女a精品一区二区-日韩欧美亚州综合久久 | 久久97人人妻人人爽人人-婷婷色 中文字幕-国产精品999永久免费-日韩毛片基地免费 | 日韩av有码在线播放-国产一区二区三区免费不卡视频-91亚洲精品久久久蜜桃网-粉嫩一区二区性色粉嫩av | 国产中文高清视频在线观看-日本中文字幕不卡一二三区-97精品国产91久久久久久久-久久久亚洲熟妇片资源 | 国内一区二区三区在线观看视频-久久电影日韩精品-久久国产精品99精品国产-中文字幕一区二区三区四区五区六 | 久久97久久99久久-天天日夜夜躁狠狠很躁-91精品一区二区三区久久久-国产精品久久久久久国产精品久久久久久 | 123香蕉免费一区二区三-国产三级特黄a级三级三级-日韩激清四季av粉嫩av-日韩精品,久久 | 成人精品一区二区免费av-国产又粗又猛又爽又黄的视频文字-久久久久久婷婷av-欧美日韩亚洲怡红院 91精品国产91久久久久久蜜臀-蜜臀av国内精品久久久人妻-国产中文字幕剧情在线播放-国产高清一区二区三区av | 日韩成人黄色激情网-国产熟妇一区二区三区四区-7777久久亚洲中文字幕密-91色偷拍自怕亚洲第一页 国产精品,自拍偷拍-久久久久久久久99精品色老板-国产乱子伦一区二区三区在-亚洲精品av电影在线观看 | 亚洲天堂xxxxav-精品日韩手机在线视频-久久人人模人人添-日韩欧美一级片一区 | 韩日中文字幕一区二区-日本中文字幕黑人借宿影片-欧美 日韩 中文 制服 人妻-人妻少妇精品久久久久久久久 | 婷婷伊人开心五月天-日韩欧美亚洲精品视频-久久国产日韩中文字幕-欧美日韩成人精品综合 | 久久久久久精品一区二区三区-高清人妻中文字幕av-日本久久精品一区二区三区-91精品久久久蜜臀 | 日韩欧美一区二区三区久久婷婷-精品国产乱码久久久久女人-日本二区不卡高清更新二区-欧美人妻精品xxxx | 成人欧美一区二区三区的电影蜜臀-精品视频1区2区3区-18禁无遮挡久久久久久-亚洲av久久激情 | 91麻豆精品国产91久久久久久久-国产精品久久久久久久久免费人妻-色哟哟精品视频在线观看入口-超碰国产一区二区三区成人 | 97人妻一区二区三区最近看-欧美伊人久久大香蕉-97久久日一线二线三线-国产av综合一区二区三区 | 国产欧美日韩在线一区二区三区-日韩免费a级片-国产视频中文字幕在线一区二区-国产欧美黑人在线 | 国产精品九九热免费-91精品国产91热久久久久福利-中文字幕av一区二区三区人妻-日韩 欧美 一区二区三区 | 亚洲人妻一区二区公司-1区2区3区4区视频在线观看-天天舔天天操天天摸-毛片av中文字幕一区二区 | 日本久久一二三四-爱爱五月天免费视频-免费中文字幕久久-精品日本乱码一区二区三区四区 | 国产一区二区欧美一区二区不卡-中文字幕久久www-亚洲va久久久噜噜噜久久一-久久久久av亚洲精品蜜臀 | 丰满人妻毛片一区,二区-91人妻精品国产综合久久久-欧美日韩国产一区二区三区视频在线观看-麻豆国产96在线日韩麻豆 | 欧美中文字幕不-2015中文字幕一区二区三区-77久久久久国产精产品-91精品久久久久久久蜜月 |